Fill out the parameters on the left and click "Generate Official CTC JSA" to produce the automated risk matrix.
Provide incident information and click the button to generate systemic root cause isolation and audit-ready CAPA.
CCV Verification Checklist (SKKNI Lifting Engineer CTC):
- Outriggers 100% fully extended on verified steel/hardwood pads.
- Wind speed < 20 knots and no high-voltage overhead lines within 5m radius.
- Rigger and Crane Operator possess active competency certifications.
- Hands-free Tag Line attached to maintain rotational control.
KLHK PROPER & Energy Efficiency Recommendations:
1. ISO 50001 Energy Management: 15% peak load reduction potential on industrial chiller and motor circuits.
2. Renewable Substitution: A 50 kWp Rooftop Solar PV installation reduces ~58 tons of $CO_2e$ annually.
3. PROPER Gold Pathway: Document 3R circular mass balance and calculate SROI for community sustainability programs.
PP No. 50 / 2012
National Occupational Health & Safety Management System (SMK3) - 166 Audit Criteria.
ESDM Reg No. 32/2021
Contractor Safety Management System (CSMS) Guidelines for the Energy & Mining Sectors.
SKKNI No. 246/2023
Indonesian National Work Competency Standard for Lifting Engineers & Rigging Supervisors.
ISO 45001:2018
International Occupational Health and Safety standard emphasizing leadership and worker participation.
ISO 14001:2015
Environmental Management Systems, emissions governance, and statutory environmental compliance.
KLHK PROPER Permen 1/2021
Corporate Environmental Performance Rating Program by the Ministry of Environment and Forestry.